How to fix issues with your radiator

It would be anybody’s worst nightmare to have a fault with their heating system during the bitterly cold winter months, even worse, not knowing how to fix the fault themselves.

Ensuring that your heating is fully functioning to keep your home warm is essential – not just for your own comfort, but to save money as well. Knowing how to resolve any minor problems, DIY style is handy, but if you’re looking to save time and want to avoid fiddling around with your radiators, our London handymen at the Handy Squad are able and willing to fix any and all problems that you’re facing, we’re just one phone call away.

  • How to fix a noisy central heating system

Remember, different models and makes of boilers have different controls, so be sure to store your operating instructions in a safe place for future usage, if needed. The majority of faults have straightforward solutions, which you should be able to do yourself – but be sure to call a professional if you are ever in doubt. We would recommend calling a gas safe engineer to deal with any boiler-related tasks (we don’t supply these engineers; however, our plumbers will be happy to help with any other tasks you might require).

Different types of a noisy central heating system include (but are not limited to):

  1. Creaking pipes

Possible cause: Hot pipes expanding and rubbing against the floor, wall or other pipes. This causes friction, which can be an unpleasantly annoying sound.

Solution: Get your pipe notches in joists widened (don’t deepen them, this will weaken the joists), clip any unsupported pipes or install insulation around and between pipes.

  1. Humming sounds in pipes

Possible cause: The pump speed could possibly be too high, or your pipes are too narrow for the system flow.

Solution: We’d recommend calling a professional for this job.

  1. Rushing sounds in pipes

Possible cause: Air or gas bubbles in the system.

Solution: Bleed the radiators. See our article on how to bleed your radiator.

  1. Hissing or banging noises

Possible cause no.1: Faulty boiler thermostat.

Solution no.1: We’d recommend calling a professional to replace your boiler thermostat.

Possible cause no.2: Limescale build-up.

Solution no.2: The limescale can be cleaned out by a professional.

Possible cause no.3: Noises could also indicate that the pump isn’t working when using a solid-fuel system (where fuel such as wood is used to heat the system).

Solution no.3: Shut down the boiler first (you can find how to do this by using your boiler operating instructions), then check that the pump is turned on and the impeller running by feeling the casing for vibration. If the switch is turned on, but the pump isn’t running, turn off the power at the mains and check that none of the wiring connections have become loose. If the pump is running, but the outlet pipe is cool, open the bleed valve to release trapped air.

Possible cause no.4: The water level in the system is too low.

Solution no.4: Follow the easy step-by-step guide below to help resolve this issue.

  • Step 1: Turn off the boiler and pump. Then, examine the feed-and-expansion cistern in the loft; if it’s empty, check that the ball valve isn’t jammed closed, also that the water supply hasn’t been turned off or check that a supply pipe isn’t frozen.
  • Step 2: If you’re able to identify and fix the cause yourself; that’s great. You can then top up the system water level again but do be sure to follow the boiler operating instructions.

 

  • How to fix cold radiators

If your boiler is still running problem-free, but you are somehow experiencing issues with cold radiators there could be numerous reasons why.

When all radiators are cold, the most common cause is when the pump isn’t working. To fix this, see this issue, we’d recommend calling a professional. Another cause of all cold radiators is that the pump’s thermostat or timer is incorrectly set or faulty. Fortunately, this can be fixed DIY style! Firstly, check the thermostat and reset it if necessary. If the thermostat or timer is incorrectly set, switch off the power and check the wiring connections, ensuring that you are following the radiator’s operating instructions.

Sometimes not all of your radiators will be cold, only some. The first possible cause of some radiators being cold is when your zone valve’s thermostat or timer is incorrectly set or faulty. A quick and easy solution for this is to reset it. Again, if set incorrectly, switch off the power and check the wiring connections, using the operating instructions. Another possible cause might be that the system may be unbalanced and needs balancing. Balancing means that all of the radiator valves are adjusted to make sure that all of the radiators heat up simultaneously. The last possible cause is the zone valve itself may be faulty. The solution is simple; replace the zone valve with a new one.

When there’s a single radiator that’s cold, the main possible cause is that the radiator’s manual control valve is turned off. To fix this problem, open/turn on the valve. However, the thermostatic radiator valve (TRV) could be incorrectly set and this could be causing the problem instead. If this is the case, reset the TRV. Speaking of the TRV, it being faulty could possibly be another cause of a single cold radiator.

Again, the fix for this is straightforward and DIY friendly, replace the TRV with a new one. If you’ve found that neither of those problems are what’s causing your single radiator to be cold, then you may have an incorrectly set lockshield valve. To fix this, open the manual valve fully, then remove the plastic cap from the lockshield valve and use an adjustable wrench to open the valve until the radiator warms up. The next time a handyman pays a visit to service the system, ask them to balance the radiator, they’ll ensure your radiator is successfully balanced. Having corrosion deposits blocking the inlet and outlet is the final possible cause of your single cold radiator. To resolve this, remove the radiator and flush it out or replace it if it needs to be. Be sure to add a corrosion inhibitor to the system.

If you’re experiencing a slightly different issue, such as a radiator with a cold top, it could possibly be that there is air trapped inside of the radiator. What’s the solution, you may ask? Open the bleed valve so that it can escape. See our article on how to bleed your radiator.

Your radiator may have a cold center or bottom, here’s how to fix it! Firstly, the possible cause of this is a build-up of sludge. To fix this, remove the radiator and flush it out, or replace it if it needs to be replaced. Also, be sure to add a corrosion inhibitor to the system.

We hope that this detailed guide was helpful and that you’ll be able to keep warm during the cold months. Our reliable handymen can be contacted if you face any difficulties when trying to resolve issues by yourself or if something can’t easily be fixed, you can always count on us. Call our friendly team on 0800-0-12-12-12 or request a free quote by filling our online booking form.

Help to set up your Christmas tree and decorations at home or in the office

The holidays are quickly approaching, presents need to be wrapped and decorations need to be put up. You may be surprised to know that we provide services to help with all your Christmas requests. As lovers of odd jobs, we have handymen in London who can help to hang up Christmas decorations, put up the Christmas tree or move Christmas furniture.

Christmas party coming up? Not enough hands? Our partners provide event setting up services including installing marquees, setting up lighting, handling audio visuals and much more. With our moving and transport team, we can also assist you with transporting party equipment. Our decorators in London specialise in various painting services for your home or office, if it’s just a pop of colour you need, a retouch or a whole room we can help you out. No matter how big or small we’ve got the hands to help.

Don’t hesitate to call. The Handy Squad has the London handymen to assist with any odd request you have regarding your Christmas planning. Need lights put up around the house? No problem, the team is always happy to help. As the nights get dark and cold, sometimes all you need is an extra pair of hands to help you tackle those winter worries and thankfully the Handy Squad can assist you with that.

We also offer many other services that can help you through the winter such as draught proofing to save you from the cold and save energy. Even if you need to baby proof Christmas decorations we have the handyman for you.

Leave your Christmas crisis with the Handy Squad. Just call with any Christmas request you have, and a handyman will be sent to you as soon as possible to make sure the holidays are filled with fun and festivities. If you need a free quote just give the team a call on 0800-0-12-12-12 or book online.

How to winter-proof your home

It’s almost that time of the year. The days start to get shorter, the scarves get out of the closet and the best thing to do after a long day of work is sitting next to the fire with a nice cuppa. Although the British weather is already famous for being cold and rainy, the British winter is the holy grail of cold and rainy days. That’s why you should winter-proof your home, thus making sure you’ll keep warm and stay away from unwanted colds.

  • Clean gutters and drains

Clearing any leaves and garden debris from your gutters and drains is of the upmost importance. By cleaning your home’s gutters, it will prevent damp from getting into the walls and by cleaning the drains you’ll be preventing blockages, which will prevent future water overflow.

  • Check your pipes

Start by making sure your downpipes aren’t cracked and that the water is running properly. To prevent burst pipes, frozen pipes and avoid blockages, wrapping your pipes in lagging would be the way to go. Lagging can be easily bought online or in some DIY stores for just a few pounds.

  • Insulate your home

Proper home insulation can reduce heat loss, reduce utility bills and save energy. Some of the heat in a house is lost through the walls and loft, for this reason insulating your loft and wall cavities is more important than ever. Loft insulation will not only help your home stay war during the winter, but it will also help your home stay cooler during the summer.

  • Seal windows and doors

If you are feeling chilly breezes in your house, it is most likely draughts coming from cracks or gaps around doors, windows or even letterboxes – these gaps are easily sealed with insulating strips. Additionally, if you have standard windows, we would recommend to double or triple glazing them to reduce heat loss.

  • Service the boiler

The worse thing that could happen on a chilly morning while you are trying to get ready for work is turning on the shower and water is completely freezing – we all know how that feels! In order for this not to happen again, make sure you get a professional to undertake an annual servicing of your boiler. This way, you’ll be assured that you’ll be able to take warm showers in the colder of wintery days.

In case your radiators are cold at the top and warm at the bottom they will require bleeding. It might seem daunting, but it is easily done. By doing this you’ll release excess air and ensure your radiators will keep your home warm throughout the winter.

  • Be smart with a thermostat

Be sure to keep your heating low during the day manually or with a timer to prevent frozen pipes. In case it’s a very cold day remember to switch the heating on earlier than turning on the thermostat up really quickly.

  • Hire an expert to undertake an energy audit

Our experienced electricians in London will be able to conduct an energy audit in your home or office to find any faults with your electrical circuit or with any of your electrical appliances to make sure you’ll keep warm and cosy during the winter.

How to lay a patio

With the summer season well under way, there has never been a better time to start planning and constructing a brand new patio design for your garden. This can be easily achieved once your flex your imagination and use some simple and effective DIY techniques.

 

 

 

 

 

 

 

 

 

Laying down and maintaining patios is just one of the many technical DIY tasks that can be handled by the Handy Squad. With our Handyman in London service, you will receive a qualified tradesmen with the required expertise to make your dream patio a reality.

Planning the layout  

You firstly need to understand the overall layout of the garden in its current state. It’s vitally important to make a drawing on graph paper to clearly indicate where any trees, shrubs, walls and fixtures are situated.

This is a simple but important step, since this drawing will enable you to make accurate estimations on how much material you will need for specific areas of your garden.

You must also consider where any patio furniture is going to be positioned and determine whether they could end up being obstructive during the process.

The Handy Squad will be able to provide a handyman to assemble patio furniture with ease, which means you will be able to pick and choose any style to suit the layout of your new patio.

 

 

 

 

 

 

 

 

 

We can also provide assistance with flat pack garden furniture assembly, to help you install general garden furniture such as benches, hammocks, deck chairs, sun loungers and gazebos.

Types of paving

There is a multitude of different paving styles currently on the market which means any patio design can be constructed. The premium option has always been the flagstone which offers a pastoral and rustic tone for your garden.

When choosing your preferred style, you will need to plan for any features you may wish to add in the future. Whether you decide to add a built-in barbeque, pond or planter, you will need to have the required space to ensure there is no upheaval as they are being installed.

A simple way to implement this whilst keeping your garden looking clean would be removing large slabs in certain areas and filling them with the appropriate amount of shingle.

It is also common for chairs and tables to be present within gardens, which will need regular wooden garden furniture treatment in order to blend with your new patio design.

Setting out the patio

You will need to mark out the exact layout of your site with pegs and string. When you are pushing any pegs into the ground, you will need to make sure that their tops are positioned at the proposed finishing level.

The patio’s level at the house wall should be at least 150mm below the damp proof course. This is typically seen as an extra wide line of mortar within the brickwork. However, in older houses, you may still see the slate initially used.

Unless you follow this procedure, there is a strong possibility that any walls on your house will start to get damp. This could also prove to be detrimental to any garden furniture you have positioned nearby. If you discover any damaged furniture that needs to be cleansed, you will need to use the Handy Squad’s jet washing garden furniture service.

 

 

 

 

 

 

Choosing your drainage

You will need to create a small slope for your patio to sit away from the house so that rain water does not pool onto it. In most circumstances this will be 1:40, however larger designs will need a cross fall of 1:80 to enhance the water run-off.

It’s important to consider the fall between the pegs being used so you can then place an appropriately sized offcut of wood on top. When you have levelled out the batten between pegs, the offcut will then account for the necessary fall.

Once you have measured down from the top of the pegs, you will be able to calculate the amount of soil needed to be removed. There needs to be enough room to account for the thickness of any slabs as well as any layers of the base. It’s always beneficial to tie string lines to each of the pegs to help assist the process.

Dig out for the base

You will firstly need to dig out any topsoil and save it for other areas of the garden. The depth in which you dig down below will be dependant on the size of your patio.

For light usage, the slabs can be placed onto a compacted 50mm bed of sand. If you want more stability, it is recommended that a 50mm semi-dry mix of sand and cement is used.

 

 

 

 

 

 

 

 

 

 

Foundation of the patio

For any areas of heavy use, you will need to have a compacted 75mm layer of hardcore placed below the sand and cement mixture. This particular substance is broken down brick and rubble, which needs to be laid over the ground and then compacted to guarantee a firm and stable base.

Once you have multiplied the patio area by the thickness of hardcore needed, you will then be able to calculate the required volume.

It is recommended that you hire a plate vibrator for the preparation stages to ensure you achieve a firm and solid base. Once the base has been prepared, you will then be able to lay the flagstones into one of the corners.

Laying down the slabs

In the case of light use, you will need to trowel five reasonably sized dabs of mortar onto the base area and then place down the first slab. Then tap the surface of the slab using a rubber mallet or the end of a club hammer and then check the spirit levels in both directions.

For heavy use, the slabs will need to be laid down on a consistent bed of 50mm tick mortar. This will ensure that the slab is supported correctly and therefore less likely to break.

It is also possible to lay down paving directly onto the sand, providing you have carefully levelled to fully support the slabs. You firstly need to place battens down at intervals in the sand, making sure the tops are at an appropriate level. Then use a straight edge to level out the sand between them by marking it along the battens.

 

 

 

 

 

 

 

 

 

Continue the process across the main area of your patio, making sure you regularly check the level. It is advised that you firstly work across the house wall, then down one side using string as a guide to ensure you are working diagonally.

It is quite common after a few years for the cement between each slab to crack and come out of place. This means regrouting paving stones is of paramount importance, since it will help get them back to their original state and prevent the growth of weeds.

Cutting the paving stones

It is preferable to leave out the slabs that need to be cut until the bulk area has been laid. You can then fill in any gaps with cut slabs, using a grinder of bolster chisel to make scores around each slab.

You must take the necessary health and safety precautions when you undertake any cutting work. It its vitally important that you wear safety goggles, work gloves and ear defenders.

Once you have scored, you will need to raise the smallest section on a thin batten and then tap the main area of the slab. This will need to be done along the cut line with the use of a bolster hammer.

It is vitally important to oversee regular maintenance of your patio in order for it to remain radiant. We have an unrivalled London Jet Washing service available at the Handy Squad, which means we can provide both a jet washing paving stones service as well as a jet washing stone steps service.

How to fix doors

At the Handy Squad, we understand the problems that can occur when doors have been fitted incorrectly. Here are some important things to consider when you first start to notice critical issues that may affect the style and functionality of your doors.

Many doors typically start sticking when edges start to rub against the frame or floor. On many occasions, something as simple as shaving away small amounts of wood could help doors to open and close more effectively.

If you have a door that starts sticking near the latch area, you will need to remove the latch before you start repairing, as this could cause structural damage to the wood plane.

Any doors that have been adjusted appropriately shouldn’t start to rattle. A majority of strike plates come equipped with a flange which can be slightly bent to help alleviate the problem.

Doors that have been fitted too loosely will most certainly begin rattling during a draught. The leading causes for this problem are doorstops being poorly positioned or the strike plate being put in the wrong place. These can both be easily moved to instantly solve the issues.

For a thorough Draft Proofing service, we have a team of highly skilled Handymen in London. They will optimise your household to ensure you save vast amounts of money on your yearly heating bill.

If you have a door that is binding on a hinged edge, you will need to ensure that you have packed out at least one hinge. This is a simple task that requires you to unscrew a hinge and then cut thick cardboard to fit the size of the hinge leaf. Make sure you position the card behind the hinge and then screw back into its original place.

 


If your door has a latch that doesn’t catch when you close the door, you may need to consider filing down the inner edges of the strike plate. Latches are unlikely to function correctly if the plate has been installed too far back within the frame.

Doors won’t close properly if the hinges have been fitted too loosely. To ensure this doesn’t happen, you will need to drill out the original holes, plug them with wooden dowels and then drill new fixing points into the surface area before re-installing the hinges back onto the frame.

Wet weather is likely to cause wooden doors and windows to stick. When this happens, you should consider rubbing beeswax around the edges that are sticking. If this solution doesn’t work, you will need to remove the door or window and then plane or sand down the edges that stick.


Never attempt to adjust windows or doors too much as they are likely to swell during warm weather conditions and then shrink once the temperature starts to decrease.

Also make sure that you never hang an external door or leave bare wood exposed since water is likely to enter the grain and cause swelling. If this does happen, you will need to remove the door, dry it and plane away the affected areas.

If you feel hesitant about undertaking certain tasks related to doors, you should consider contacting any of our highly-skilled Carpenters in London. They offer a variety of relevant door related services, which includes: Hang New Door, Plane Door & Rehang and Repair Door Frame.

How to fit door locks

It is of paramount importance that all doors are secured to a sufficient level in order to prevent unwanted intrusions into your home.

Installing locks properly is often an arduous and time consuming task. That’s why the Handy Squad has a team of highly-skilled Locksmiths, to ensure security concerns are a thing of the past. They will be able to fit, change and repair any locks with ease.

Important information

The two most popular types of lock for entrance doors are the mortice lock and the cylinder rim lock.

In order to open a mortice lock, you will need to insert a key from both the inside and outside of the door. This is most commonly referred to as a deadlock.

Mortice locks are typically equipped with 2 to 7 levers. The difficulty of picking mortice locks will increase as you install more levers to the mechanism. In the case of entrance doors, you will be required to have a mortice lock with five levers.

A majority of mortice locks come in a standard size. You also have the option of replacing old mortice locks as long as the distance between the door edge and handle are the same.

On the other hand, cylinder locks are highly beneficial for people moving house since they can be installed and replaced with ease. They simply slot into place and come in a variety of different sizes.

Cylinder rim locks that use a deadlock will have a key for the outside and a key operated knob for the inside. The key used for internal use will provide the option of a deadlock system. This basically means that the door cannot be opened if someone smashes the glass in the door and attempts to turn the knob.

It is suggested that cylinder locks and five-lever mortice deadlocks should be fitted 45-60cm apart in order for them to be effective.

Mortice door bolts have the option of being fitted onto the edge of doors. The best way to maximise security is placing one close to the top and one close to the bottom of the opening edge on the door.

There are a number of useful supplements to increase security, which includes: door limiters, security chains and surface mounted bolts. All of these are simple to install and are guaranteed to provide long-lasting quality results.

Many uPVC doors run the risk of damage from retro-fitted security systems. If you have any concerns about the types of locks that are appropriate for your door, you should always contact the manufacturer. If you have a modern door in place, you will most certainly have a multi-locking system already in place.

Any doors which have glazed panels should be equipped with a deadlock since they don’t possess the same structural integrity as solid doors. You should consider replacing any glass panels with either laminated or toughened glass.

Finally, patio doors are commonly used by thieves, which means you should consider installing extra locks. The best options for this type of door is push-to-lock or key-to-open, since they are simple to use and will fit perfectly within a frame.

How to fit a mortice security bolt

1. You firstly need to mark out the position of the bolt within the door edge. Then drill a hole with the same depth as the door bolt.

2. Insert the bolt and then mark a clear line around the outside perimeter of the end plate. This can now be used as a guide for chiselling.

3. Using a chisel, you then need to carefully take away enough wood in order for you to fit the door bolt end plate in a flush manner.

4. Using the chiselling as a guide, hold the bolt up against the inside part of the door and make an accurate marking to position where the keyhole will be placed.

5. Then drill a hole in accordance with the depth of the door. You need to ensure that you don’t drill all the way through the door.

6. In order for the bolt to be installed securely, you firstly need to drill a series of pilot holes for the fixings. The most suitable sized drill bit would be 2-3mm. You will then be able to slide the bolt into place and fix securely.

7. You can now drill the required pilot holes before fixing the key plate into its place. You must ensure that the plate has been aligned correctly with the keyhole.

8. Finally, you need to check that the key works properly.

How to replace a five-lever sashlock

1. You firstly need to remove the handle that is placed on the inside. This is done by unscrewing all of the retaining screws that are holding the handle in its place. You can then place the handle onto one side for reattachment at a later time.

2. Then remove the spindle bar that fits through the lock as well as both handles. Once removed, make sure you place them to one side as they will be reinserted later.

3. All the screws that secure the lock then need to be removed. It is possible that you may need to push a screwdriver through the spindle hole to help release the lock.

4. The replacement lock can now be screwed and fitted into position. If you have difficulty putting the lock into place, you will need to chisel away any excess wood.

5. Finally, you can now reposition the spindle as well as the inside handle. You must ensure that the new lock works methodically and engages with the strike plate in an effective manner.

How to replace a cylinder lock

1. You firstly need to remove the body component of the lock. This will need to be fitted back into place once the new lock has been installed.

2. Then unscrew both retaining screws that go through the door and keep the cylinder component of the lock in its place. You also need to ensure that the mounting plate remains in position.

3. You can now remove the old cylinder from the outside. Once this is done, slide the new cylinder through the drilled hole and refit using long screws.

4. The lock body can now also be re-installed. If the connecting bar exceeds the required length, you will need to remove the lock body and cut down the size of the bar with a hacksaw.

5. Finally, once you are certain that the lock body has been securely put into position, you will need to ensure that the door opens and closes smoothly when operated with the new key.

If at any point you need an extra pair of hands, don’t hesitate to contact our team.

How to remove a radiator for decorating

At the Handy Squad we have a team of highly skilled Decorators currently working in London. With over a decade of proficient and effective service, they will be able to assist with a wide variety of decorating tasks such as; Filling cracks in walls and Plaster patch repair.

For plumbing issues, we have an equally qualified team of Plumbers in London. They will be able remove radiators with ease and in a timely manner as well as being able help with Replacements or Installations that may be required after removal has been completed.

If you need to temporarily remove your radiator to be able to paint or decorate behind it, the Handy Squad have got the perfect how-to guide, which will help you complete this task effectively and with ease.

Firstly, you will need old sheets or equivalent for water spillage, a bucket, a bowl that is able to fit under the radiator, a screwdriver and an adjustable spanner.

Then, place the old sheets under the radiator and a bowl underneath the manual control valve, which is the valve used to control the temperature of the radiator. Then drain the water from the radiator, use a clockwise motion to turn both valves off and unscrew the cap nut that keeps the manual control valve that attached to the radiator.

Then, slowly open the bleed valve at the top of the radiator to let the water drain out. When the bowl is full, tighten the cap nut, empty the bowl into the bucket and repeat the process until the water flow has stopped.

Before removing the radiator from its wall brackets, unscrew the cap nut that holds the other valve. Next, carefully lift the radiator and empty the remaining water.

After decorating, you will need to put the radiator back onto its supporting brackets. Then, close the cap nuts on both valves and after this step you can open both valves. As the radiator fills up, open the bleed valve to release any trapped air.

If at any point you need an extra pair of hands, don’t hesitate to contact our team.

How to remove air locks from your residential and commercial pipes

The Handy Squad is the number one handyman service in London. We have a team of highly efficient plumbers who will take on anything from unblocking a blocked toilet to installing new white good appliances. We also offer electrician services, decorating services, carpentry, locksmith services and much more.

When pockets of air are trapped by the water flow, it creates air locks, which will block the water pressure completely. To have your residential or commercial pipes working properly again, you will need to follow this how-to guide on how to effectively remove air locks.

First Method

There are two ways you can fix this problem. The most effective way of dealing with air locks is increasing the water pressure to push out the air bubble. For this first method you will need a hosepipe.

Attach the hosepipe to the tap that is not working properly and the other end of the hosepipe to a working tap. Turn both the faulty and working taps on, and then leave the water running for a few minutes.

If the tap is working again, remove the hosepipe from the highest tap and then from the lowest tap.

Second Method

If the last method did not work, the second method to fix the problem is to drain the whole pipe system.

Firstly, turn off the water supply at the main water valve. Next, turn on all the taps in the property and flush the toilets until they stop filling up. When there is no water coming out of any taps, make sure to partially close them, so there will be low water pressure getting out.

Turn on the water supply and then turn on all the faucets in the property. The high-water pressure should be able to remove any air locks in the pipes.

How to prepare to lay laminate and real wood flooring

At the Handy Squad we have a team of highly trained Carpenters, all skilled with anything related to Flooring. However their expertise doesn’t stop there as your Carpenter in London can also provide services which relate to; Sash windows, Cupboard doors, Hanging doors, Kitchen units, Shelves and Partition walls.

Preparation is an essential part for the installation of laminate and real wood flooring. Ensuring you have undertaken the required steps before laying any material, will guarantee both a neat and stylish finish.

 

 

 

 

 

You firstly need to ensure you have modified your working space appropriately. The room needs to have been emptied of furniture, floor coverings or any rugs and mats. Any fixings, such as rods or adhesive, should also be removed to leave the floor space level.

One of the most crucial elements for this process, is ensuring you have smoothed out the sub-floor area. You also need to check that the surface is dry and precisely level throughout in order to maximise the structural integrity of your floor. Once you have an even surface to work with, you need to install underlay, in order to achieve an effective final fitting.

There are two types of underlay that can be used for laminate and real wood flooring. The foam version, is either folded into a concertina or slotted together in the style of a jigsaw puzzle. Whereas fibreboard underlay, needs to be cut precisely and installed at a 90-degree angle in the direction that your flooring is being laid.

 

 

 

 

 

Before the aforementioned can be done, you need to ensure that there are no damp areas present on your flooring. You should regularly test the integrity of the surface and only conduct fitting once you are certain that you have a clean area to work with.

When your laminate and real wood flooring arrives, you will need to give it time to adapt to the temperature and humidity of your house. This will reduce the likelihood of gaps appearing between any of your flooring boards. Previously, the materials will have most likely been exposed to differing conditions, meaning a transitional period is required to alleviate shrinking or expanding.

To allow your flooring to adjust, you need to stack them on top of each other, whilst keeping them secured in their packaging. You need to position them in a way that allows air to circulate between each package and ensure they are not pressed against any walls, otherwise this could cause the material to bow.

It’s also important to ensure you are wearing knee pads during the entire process, since a consistent level of exposure to solid surfaces could cause strain on your body.

How to build a Greenhouse

At the Handy Squad we have a team of highly efficient and skilled Handymen, ready to assemble your greenhouse with ease. Your Handyman in London can do more than assembling greenhouses, we can also help with the following jobs; Flat pack assembly, Hanging things up, Tiling, and Odd jobs.

Greenhouses are the perfect way to breathe new life into your garden, allowing the growth of fresh fruit and vegetables within a controlled and practical environment. With the spring season approaching, now is the perfect time to start planning and constructing a greenhouse ready for the forthcoming climate.

Securing the base

Making sure you have secured the base of your greenhouse is crucial for structural solidity. Many people typically fix a greenhouse onto a brick or cement surface, in which a galvanised steel base will be required. The width and length of the structure will need to be accurately marked in accordance to the size of your greenhouse.

 

 

 

 

 

 

Once you have the base measured and assembled, you will need to dig out a footing trench to act as the platform to grow produce. The centre will then need to be filled with concrete and levelled out neatly to ensure the surface is precisely even. Once the concrete is dry, mark a line around the entire edge of the footing trench. You will then be able to lay down a course of bricks for the galvanised steel base to rest.

Constructing the Greenhouse

Always start by putting together either the front or back component of your greenhouse. Lay all the pieces down onto a flat surface and put them into the required position, ready to be fixed together. Make sure that angled pieces are facing the correct way and bolts are exposed in the right direction.

You then need to repeat the procedure for the other end and the two side components. Every time a section is put into place, you need to make a loose fixing, ready for it to be placed into its final position.

 

 

 

 

 

 

Once all the sections are placed into their respective positions, they need to be loosely screwed together and then fixed to the galvanised base. The roof bar then needs to be placed on the top of the structure, resting on the two ends.

You then need to make sure everything has been placed correctly. You should use a spirit level to ensure the structure is firm and straight throughout. Once you are certain that your greenhouse has been properly assembled, you will then need to tighten all the screws to their maximum.

 

 

 

 

 

 

The galvanised base will then need to be permanently fixed onto the brick surface, providing you a far stronger finish compared to a cement fixing. This means the structure has now been fully assembled and is ready for the window panels to be installed.

To ensure the panels are fixed securely, you will need to slide a thin layer of rubber around the frame area of the greenhouse. You can now position each panel in its place and fix them using clips. The roof vent should be put together first and put into place along the roof edge. Finally, put the doorway together and slide into position.